Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
Re: [sumo-user] Highway Modelling

I recommend getting rid of all the grey connections. They will confuse the strategic lane choice algorithm and model unrealistic movements.

Am Do., 12. Nov. 2020 um 15:01 Uhr schrieb VictorKyriacou <vkyria02@xxxxxxxxx>:
Hello thanks for the reply yes I have 3 different vehicle distributions to
create randomness. I have already set the departLane to "best".

The problem is that I don't want the lcCooperative value to be a high value
because I want the scenario to be as realistic as possible. I modified the
connections to be as the screenshot indicated now but again this is not a
realistic scenario, where a vehicle drives from the most right lane to an
offramp in such a close distance. Although the workaround "solution" I
mention might solve the issue, I don't also want the vehicles to stop on a
highway lane to wait for the chance to cross on the off ramp. 

The whole network:
<http://sumo-user-mailing-list.90755.n8.nabble.com/file/t516/Capture2.png>

Off-ramp and the connections:

<http://sumo-user-mailing-list.90755.n8.nabble.com/file/t516/Capture3.png>



--
Sent from: http://sumo-user-mailing-list.90755.n8.nabble.com/
_______________________________________________
sumo-user mailing list
sumo-user@xxxxxxxxxxx
To unsubscribe from this list, visit https://www.eclipse.org/mailman/listinfo/sumo-user

Back to the top