Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
Re: [che-dev] Release plans

Perhaps, sharing a list of features that rh-che is planning soon with deadlines can help better understand priorities? Sergey has mentioned that 5.20 is possible for some relatively urgent must -have's.

What I would like is really to keep working as usual, pushing to master new features as soon as they are ready. 

We want to deploy multi tenancy on osio by the end of this sprint, this is something we have been looking for a loooong loong time and we are really close now. Introducing a new "official" branch for new features, where something "may" not work but where we still need to port and test our new features may slow us down.

For the list of features: looking at current sprint backlog these are new features that we would like to merge in eclipse/che by the end of the sprint:

- multi tenancy on osio related tasks (#370, #369#345#344 and in general #107)
- running multi machine workspaces (#364)
- extend the CLI to start Che on OpenShift (#347)
- using logback jsonlayout (#311)




Back to the top