[
Date Prev][
Date Next][
Thread Prev][
Thread Next][
Date Index][
Thread Index]
[
List Home]
Re: [ptp-dev] 2.0 Release Planning
|
Info for PLDT 2.0:
- a brief list of the major features
PLDT 2.0
-- adds a new single-menu UI for PLDT analysis features, simplifying the
editor toolbar
-- MPI Barrier Analysis detects possible deadlocks in MPI applications
-- New project wizards and templates for MPI and OpenMP projects
-- Welcome page addition includes pointers to PLDT information (PTP core
too)
- a brief list of the documentation and other non-code aspects
-- PLDT help includes instructions and tutorial for using the major
features.
-- Welcome page addition announces PLDT content and guides the user to
help/tutorial
- a brief list of non-provisional API's and extension points
None.
- anything else you want in the review
Nothing else I can think of.
I have updated the test plan on the wiki somewhat.
..Beth
Beth Tibbitts (859) 243-4981 (TL 545-4981)
High Productivity Tools / Parallel Tools http://eclipse.org/ptp
IBM T.J.Watson Research Center
Mailing Address: IBM Corp., 745 West New Circle Road, Lexington, KY 40511
Greg Watson
<g.watson@compute
r.org> To
Sent by: Parallel Tools Platform general
ptp-dev-bounces@e developers <ptp-dev@xxxxxxxxxxx>
clipse.org cc
Subject
02/27/08 08:56 PM ** [ptp-dev] 2.0 Release Planning
Please respond to
Parallel Tools
Platform general
developers
<ptp-dev@eclipse.
org>
I think we're now in a position to finalize the 2.0 release, so I'd
like to propose the following timetable:
3/05/08 Release review documentation and legal review completed
3/12/08 PTP 2.0 release review
3/17/08 Final pre-release build
3/17/08 Start testing period
3/24/08 First release respin (if required)
3/28/08 End testing period
3/28/08 Second release respin (if required)
3/31/08 2.0 target release date
Unfortunately the first week of testing coincides with EclipseCon, but
I don't think there's anything we can do about that. Perhaps we can
have an informal test-a-thon at EclipseCon?
To meet this timetable, the following is required from each major
component provider:
1. By 3/5/08, provide:
- a brief list of the major features
- a brief list of the documentation and other non-code aspects
- a brief list of non-provisional API's and extension points
- anything else you want in the review
2. Update the 2.0 test plan prior to 3/17/08. The test plan is here:
http://wiki.eclipse.org/PTP/testing/2.x
3. Undertake some testing during the testing period.
The major component providers are:
Greg Watson - PTP Core
Beth Tibbitts - PLDT
Dave Wootton - PE/LL
Daniel Ferber - Remote Tools
Wyatt Spear - Performance Tools Framework/TAU
Please let me know if this is achievable, or if we need to reschedule
the release.
Thanks,
Greg
_______________________________________________
ptp-dev mailing list
ptp-dev@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/ptp-dev