Hello,
my own test shows a flow of ~880.
If the road after the signal continues at 14m/s, flow drops to 780
If there is a turn after the signal, flow drops even further depending on turning radius.
Can you share your scenario?

regards,
Jakob


Am Do., 10. Sept. 2020 um 19:23 Uhr schrieb Bae, Jong In <jbae42@xxxxxxxxxx>:
Hello,

I ran a simple experiment to measure the capacity of a one-lane signalized exit ramp that is 1500 feet long.
The result came out a lot higher than expected. The capacity came out to be roughly 1,100 veh/hr. (I was expecting to see around 750~800 veh/hr since the ramp is signalized). 
Is this a typical capacity value in SUMO? I've also included a brief scenario settings and methodology below.

The goal was to measure the capacity of a one-lane exit ramp which is 1500 feet long.
A signal (G:50, R:70) is placed at the end of the exit ramp. A single vehicle type was used with minGap=2.2 and tau=1. 
The speed on the exit ramp is 24.59m/s (approximately 55mph). A few iterations were done with various traffic flows.
Each iteration was run for 4500 timesteps where the vehicle count of the last 3600 timesteps was collected (first 900 timesteps were a warm-up period).
e3detectors were placed right after the signal and 'vehicleSum' was used to get the vehicle count for the 3600 timesteps.
The maximum count out of all iterations was determined to be the capacity.

Any help would be greatly appreciated.

Thank you,