[
Date Prev][
Date Next][
Thread Prev][
Thread Next][
Date Index][
Thread Index]
[
List Home]
Re: [ptp-dev] Monthly conference call
|
I'm having major problems with the rewrite I've been doing with how it
pertains to Open-MPI. They changed their model around so that when I
ask ORTE what nodes it knows about it will only report those that it has
discovered so far. Sadly for us, this only comes in when you've run a
job and that's not the model under which we run on startup. I've gotten
some code from them that supposedly forces a discovery phase but it seg
faults our proxy, which isn't very useful at this time. Trying to
figure out what's causing it is quite difficult.
I'd like to say that I'll include this new rewrite in the 1.1 release
but I'm not really getting anywhere right now. I've rewritten half of
it, went into testing phase (which I'm sure will have bugs that I need
to iron-out) but these Open-MPI problems have really set me back to
square one. I can't even RUN the damn thing, let alone figure out how
my reorganization of the Java code and proxy (which was radically
changed) effects other things.
The changes I'm introducing are pretty major, but they won't really
change the way anything actually LOOKS. It's just the rippling effect
they have on the rest of the code base.
-- Nathan
Correspondence
---------------------------------------------------------------------
Nathan DeBardeleben, Ph.D.
Los Alamos National Laboratory
Parallel Tools Team
High Performance Computing Environments
phone: 505-667-3428
email: ndebard@xxxxxxxx
---------------------------------------------------------------------
Greg Watson wrote:
Ok, let's postpone until next month.
Until then, as Beth suggest, we should begin firming up the 1.1
release plan. Please post what you plan to include in this release and
I'll update the planning document. We can discuss at the meeting next
month.
Greg
On Jul 5, 2006, at 8:33 AM, Beth Tibbitts wrote:
Do we need to start firming up plans for Release 1.1 in September?
Dates to aim at? Feature freeze / bug fixes / documentation / etc
end-run
stuff?
We could do that here on ptp-dev until next month.
...Beth
Beth Tibbitts (859) 243-4981 (TL 545-4981)
IBM T.J.Watson Research Center
Mailing Address: IBM Corp., 455 Park Place, Lexington, KY 40511
Greg Watson
<g.watson@compute
r.org> To
Sent by: Parallel Tools Platform general
ptp-dev-bounces@e developers <ptp-dev@xxxxxxxxxxx>
clipse.org cc
Subject
07/05/2006 10:15 [ptp-dev] Monthly conference call
AM
Please respond to
Parallel Tools
Platform general
developers
<ptp-dev@eclipse.
org>
Hi all,
I have a conflict next Tuesday so I won't be able to attend the call.
Does someone want to volunteer to run the meeting, or should we
postpone it until next month?
Greg
_______________________________________________
ptp-dev mailing list
ptp-dev@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/ptp-dev
_______________________________________________
ptp-dev mailing list
ptp-dev@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/ptp-dev
_______________________________________________
ptp-dev mailing list
ptp-dev@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/ptp-dev