Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
[technology-pmc] PMC approval requested for Jubula 7.0

Dear PMC members,

 

I like PMC approval for the Jubula 7.0 release that was scheduled to coincide with Eclipse 2018-09. The release contains bug fixes and features. This was a past release and I have missed to do some necessary steps. Sorry for the inconvenience.

 

Release review materials:

https://projects.eclipse.org/projects/technology.jubula/reviews/7.0-2018-09-release-review

 

Thanks and best regards

Marvin Müller

 



BREDEX GmbH
Lindentwete 1
38100 Braunschweig

Tel.: +49 531 24330-0
Fax: +49 531 24330-99


Geschäftsführer: Andreas Vogel, Ulrich Obst, Achim Lörke
Amtsgericht Braunschweig HRB 2450


www.bredex.de

Attachment: smime.p7s
Description: S/MIME cryptographic signature


Back to the top