I’d like to request PMC approval to proceed with
release reviews for Sapphire 0.1 and 0.2 releases. Both releases are
currently scheduled for 2011-01-10. I hope there is still time to run
through the review process.
The initial contribution has final IP approval
and IP log has be submitted to EMO.
I am working on release review documentation. In
the meantime here is some information on these two releases:
http://www.eclipse.org/projects/project-plan.php?planurl=http://www.eclipse.org/sapphire/plans/0.1.xml
http://www.eclipse.org/projects/project-plan.php?planurl=http://www.eclipse.org/sapphire/plans/0.2.xml
The 0.1 release represents a snapshot of a
stable code base as contributed by Oracle and adapted for Eclipse
namespace, license, about, build, etc. The 0.2 release contains
significant functional enhancements over 0.1 release (as documented in
the plan document). They are scheduled to release concurrently since
work on 0.2 was proceeding while we were waiting for final IP approval
on the initial contribution.
Let me know if there are any questions.
Thanks,
- Konstantin