Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
[ecf-dev] ECF 3.5.2 - Aug 29th?

Hi Folks,

In a previous posting...along with a couple of ECF conference calls, I had proposed Aug 29 2011 for ECF's 3.5.2 maintenance release. I would like to assume that we can do this, but I want to verify that a couple of the significant bugs are addressed.

Here are the bugs fixed since ECF 3.5.1/Indigo release [1] .

Following are the outstanding bugs that I think we should try to address for ECF 3.5.2:

[2] Hang in zookeeper discovery
[3] JMDNS Discovery thread slowing down shutdown (this is a bug in JMDNS upstream project...not in ECF provider that builds upon it).

Of course, if there are other committers and/or contributors that wish to work on other remaining bugs for 3.5.2 here [4] is a full list of outstanding bugs.

I think particularly 2 would be good to address. Wim and other zookeeper provider authors...do you think that 2 can/could be addressed and tested before Aug 29th?

The reason Aug 29th is important is that the Indigo maintenance release is in mid-september, and we will need to have our maintenance release in place before then in order to have ECF 3.5.2 be in the Indigo maintenance release.

Any comments welcomed.

Thanks,

Scott


[1] https://bugs.eclipse.org/bugs/buglist.cgi?chfieldto=Now;query_format=advanced;chfieldfrom=2011-5-20;bug_status=RESOLVED;bug_status=VERIFIED;bug_status=CLOSED;classification=RT;product=ECF

[2] https://bugs.eclipse.org/bugs/show_bug.cgi?id=353835
[3] https://bugs.eclipse.org/bugs/show_bug.cgi?id=348487

[4] https://bugs.eclipse.org/bugs/buglist.cgi?bug_severity=blocker;bug_severity=critical;bug_severity=major;bug_severity=normal;bug_severity=minor;classification=RT;query_format=advanced;bug_status=NEW;bug_status=ASSIGNED;bug_status=REOPENED;product=ECF


Back to the top