[
Date Prev][
Date Next][
Thread Prev][
Thread Next][
Date Index][
Thread Index]
[
List Home]
Re: [sumo-user] SITE EVALUATION
|
personinfo-output records the exact vehicle that was taken by each person so this will show up along with the person id in the xml/csv output. (along with the time spent waiting for pickup).
Thank you very much! In my case traffic will only happen inside the site, meaning I have an entry and an exit point as well as one pick-up/drop-off point. The passengers will arrive at the site in their vehicles and then be dropped off. Then at shift change, they need to be picked up and leave the site. My guess is that I have to store/ park the workers somewhere.
One of my issues is that I don't know if after I ID-d a bus, can the person's ID that took that bus be extended with the bus ID. Then I believe in the csv I can see each person that took a specific route, how long did it took them to reach the drop-off.
Is my thinking correct? Is this okay for me to ask more questions in the future?
> Can sumo handle this data generation?
Yes. Depending on the required level of detail (i.e. having morning and evening in a single simulation, detailed public transport, parking search, consistency in returning to the original home location) you could either set this up with two randomTrips calls
randomTrips.py --persontrips -n net.net.xml -t -e 1000 " modes=\"car\""
randomTrips.py --persontrips -n net.net.xml -t -e 1000 " modes=\"public\""
> How long would it take to generate this report?
simulating 2000 persons should be quite fast. Setup time depends a lot on the needed details and your experience
> Can I get a CSV report at the end?
> Get the waiting time of an individual? How long does it take for an individual to arrive? To get to the exit.
Yes. This is all deducible from --personinfo-output.
regards,
Jakob
Dear Community!
I have the following task at hand.
There is a large factory that requires a multi-modal traffic sim. In this stage, I have to simulate approx a 2000 people shift change that will go like this:
2000 people arrive at the factory. 50% by bus 50% by car. Those who will come by bus will also be divided into several other groups. Then at shift change, I have to change the personnel so 1000 people have to go by bus/meaning they need to take on at some destinated station, and another 1000 will go to their cars and leave the premise.
Can sumo handle this data generation? How long would it take to generate this report? Can I get a CSV report at the end? Get the waiting time of an individual? How long does it take for an individual to arrive? To get to the exit.
These processes have an established(documented) workflow or I have to develop them somehow.
_______________________________________________
sumo-user mailing list
sumo-user@xxxxxxxxxxx
To unsubscribe from this list, visit https://www.eclipse.org/mailman/listinfo/sumo-user
_______________________________________________
sumo-user mailing list
sumo-user@xxxxxxxxxxx
To unsubscribe from this list, visit https://www.eclipse.org/mailman/listinfo/sumo-user
--
Haritonov Alexander
_______________________________________________
sumo-user mailing list
sumo-user@xxxxxxxxxxx
To unsubscribe from this list, visit https://www.eclipse.org/mailman/listinfo/sumo-user