Hi Glenn! :)
Thanks for your comments, I think your requirement list overlap a great
deal the requirement we had as well, namely:
(A) is covered by the proposed design (and implementation) that we
provided in the freescale patch plugins. The core.resources plugin how
has an additional extension point that other plugins can implement and
define additional variables that can be used to resolve linked
resources. The variables "PROJECT_LOC", "WORKSPACE_LOC" and "ENV" are
provided by default, but additional products benefit from having source
tree variables being provided, such as "STARCORE_SUPPORT", etc...
(B) and (C) are also fully supported by our design.
(D) How we handled the issue with broken links and absolute paths is by
providing a small tool that the user can invoke by right-clicking on the
project resource. The tool then lists the linked resources and group
them by "relative path", "broken links", and "absolute paths links".
The powerpoint presentation attached to this email describe a little bit
this tool. Although we haven't provided the source of that tool in the
freescale patch plugins we submitted to the eclipse bug database, we can
certainly make it available on demand.
We haven't addressed (E) with our proposed design, although it sounds
interesting. From our perspective what is missing is that, although
that it is currently possible to add a project dependency ("Project
references") to an existing project, it isn't possible to specify a
dependency for a specify CDT build configuration. So for instance, the
debug build configuration of one project can't rely specifically on the
build configuration of another project, only on the currently active
build configuration of its dependency.
Serge Beauchamp.
Software Engineer
Freescale Semiconductor
Glenn Meter wrote:
Doug,
I'm coming in late to this discussion. But as an Eclipse Java user and
as a former lead of the CodeWarrior IDE team, here's my two cents.
My suggested basic requirements are:
(A) Allow linked resources to resolve to absolute paths or paths
relative to one of:
- The project
- A workspace variable
- The workspace
(B) Projects that only use paths relative to the project should be
able to be checked out from CM into a new [CM] workspace and "just
work" (whether on my machine, another machine with the same OS, or
another machine with a different OS). I should not have to create any
symbolic links or do any other setup to be able to edit, compile, and
debug the application.
(C) The resolution for a linked resource should be able to be viewed
and changed via the Properties for the item. In 3.3, if a linked
resource uses a workspace-variable-relative path and the variable is
not defined then the Properties page for the resource does not show
the resolution information. This makes it difficult to fix the problem
by declaring the missing workspace path variable. It's not possible to
fix the problem without viewing the .project file.
(D) Any referenced but undefined workspace path variables should show
up in the workspace's Problems list.
(E) Projects should be able to refer to other projects, and include a
preference for whether the referenced projects should be built before
the referring project. If I have a project hierarchy, I should not
have to duplicate the hierarchy in each workspace that includes a root
project.
I also agree with Serge (hey, Serge!) that it should be easier to
create linked resources in general via drag & drop, etc.
I'm looking forward to see what you come up with at the E4 Summit.
Best regards,
Glenn Meter
meter@xxxxxxxxxxxxxx
gmeter@xxxxxxxxxxxx
_______________________________________________
platform-core-dev mailing list
platform-core-dev@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/platform-core-dev
Attachment:
ProjectFileStructure.ppt
Description: Binary data