[epf-dev] Re: Fixes in OpenUP - need to freeze the library
|
I will be on vacations next week ... so .. to me its fine :-)
Ricardo Balduino wrote:
Hi everyone,
We are fortunate to have a contribution from someone in IBM (Tushara
Gangavaram) who ran a check on OpenUP/Basic content to evaluate its
accessibility and globalization readiness.
Tushara is also offering her time to fix the errors found. See more
details on the bugs below.
_176835_ <https://bugs.eclipse.org/bugs/show_bug.cgi?id=176835> ASSI
EPF Content 0.9 1.0 M6 General - Check OpenUP/Basic content for
accessibility
_176836_ <https://bugs.eclipse.org/bugs/show_bug.cgi?id=176836> ASSI
EPF Content 0.9 1.0 M6 General - Check OpenUP/Basic content for
globalization
Now here's the deal. Tushara is proposing to fix the errors next week,
and the turnaround should be 2-3 days.
I'm writing this note to ask you if you - OpenUP content leaders and
content authors - see any problem freezing the library from Monday
through Wednesday next week. That would be the safest way to fix the
problems, as Tushara has no write access to CVS. I'd intermediate the
"check out" and "check in", but it is essential that no other changes
are applied to the library in the mean time, so we don't have to merge
xmi files :-(
If you have any objections, please let me know, otherwise your silence
will be considered as "go ahead".
Please commit any changes today by 3PM PST, so I can generate a new
build and post on the EPF web site. If you need more time, please let
me know.
Thank you.
Ricardo Balduino
Senior Software Engineer
IBM Rational Software (www.ibm.com/rational)
EPF Committer (www.eclipse.org/epf)