Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
Re: [cross-project-issues-dev] Simrel gerrit builder is still called "photon" ? Simrel pipeline has missed 28 commits?

Worse... I just noticed that the simrel gerrit validator is using Eclipse 4.8 not 4.9, so it's validating the wrong baseline. See the section [4] labelled "tycho-eclipserun-plugin:1.0.0:eclipse-run (validate-repo) @ build" for more details.



On Thu, Aug 30, 2018 at 9:25 AM Nick Boldt <nboldt@xxxxxxxxxx> wrote:
Couple quick questions for the simrel admin folks:

a) I submitted a gerrit request to update DLTK from 5.9RC4 to the latest 5.10 nightly, and it passed... but the job that ran was called "photon" [0]. Should that job be renamed to "simrel.2018-09" instead of "photon" ?


b) Then I noticed that there's a pipeline gerrit job too, but it hasn't run for 3 days [1] and is 28 commits [2] behind master, stuck on a Modisco change from Fabien Giquel [3]:

[1] https://ci.eclipse.org/simrel/job/simrel.runaggregator.pipeline.gerrit/7/

So... should that be running more often?

If you'd like me to have a look at the job configs, please grant me access and I will investigate further. Maybe it's not set to run via a cron / check github for changes? 

--

Nick Boldt

Principal Software Engineer, RHCSA

Productization Lead :: JBoss Tools & Dev Studio

IM: @nickboldt / @nboldt / http://nick.divbyzero.com



“The Only Thing That Is Constant Is Change” - Heraclitus


--

Nick Boldt

Principal Software Engineer, RHCSA

Productization Lead :: JBoss Tools & Dev Studio

IM: @nickboldt / @nboldt / http://nick.divbyzero.com



“The Only Thing That Is Constant Is Change” - Heraclitus

Back to the top