[
Date Prev][
Date Next][
Thread Prev][
Thread Next][
Date Index][
Thread Index]
[
List Home]
Re: [cross-project-issues-dev] Final Release Build
|
I think what Ed means is that some projects need to respin their builds (against the same bits) using a different build type (e.g., "R" instead of "I") and those builds need to be published to a different repository location (release repo instead of milestones repo) before the final release. I assume such projects should be considered exceptions so that they are picked up by a final "on demand" aggregation?
Kenn
On Thu, Jun 10, 2010 at 11:06 AM, David M Williams
<david_williams@xxxxxxxxxx> wrote:
Not sure. And, not sure I know what
you mean. Normally when I hear "rename" it just involve zip files
and directory names. Do you mean the directory part of the URL in the .build
file? In the past, people have just corrected those to final location (after
the release, normally) and does not require a respin. This is not ideal,
obviously, since we are not literally building from the final URL, but,
honestly, we always have the risk that the contents of a URL changes and
breaks the build, or makes it non-reproducible.
If I've not answered what you need to
know, please ask again.
Thanks,
_______________________________________________
cross-project-issues-dev mailing list
cross-project-issues-dev@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/cross-project-issues-dev