[
Date Prev][
Date Next][
Thread Prev][
Thread Next][
Date Index][
Thread Index]
[
List Home]
[cosmos-dev] The iteration 2 plan and reporting weekly test status
|
Hi team,
I've updated the Release Plan's Milestone 1 Objectives for Iteration 2 to
provide links to the test status reports that must be filled in weekly.
http://wiki.eclipse.org/Cosmos_Release_Plan#Milestone_1_Objectives_.28i1_-_i3.29
By EOD Friday the Iteration 2 plan will list all major deliverables for
Iteration 2. v1.1 Iteration 2 plan:
http://wiki.eclipse.org/COSMOS_1.1_Iteration2_Features Minor bug fixes
will not be listed. On Monday we begin Iteration 2 development week #1.
You can see our release schedule at any time by clicking on the "Release
Schedule" link on our COSMOS home page ( http://www.eclipse.org/cosmos ).
A reminder that every committer and contributor to COSMOS must ensure that
the code is kept clean at all times. That means that every week, when
someone runs the tests for your component, please check the build's build
reports to ensure that your component is not mentioned, and also ensure
that every bullet listed on the weekly status page has been checked. For
an example, look at the weekly status page for Iteration 2 week 1 ( v1.1
Iteration 2 week 1 test status: http://wiki.eclipse.org/COSMOS_v1.1_I2w1 )
for the list that you should be doing every day. To find the Build
Reports, when you're on the Downloads page, you'll see a link to the
driver and to the right you'll see a link named "Build Reports". I just
checked the week 5 driver and there are copyrights missing and plugins
missing about.html files. This has to be cleaned up for Iteration 2. I'll
open defects.
Thanks,
Ruth.
Ruth Lee
IBM Toronto Lab
ruthdaly@xxxxxxxxxx