Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
[che-dev] Please resolve or move your 7.15 milestone issues :: Reminder about Che 7.16 sprint focus

There are currently 30 unresolved issues (with only 16 closed!) for 7.15, so it seems like it's time to send a reminder again.

https://github.com/eclipse/che/milestone/118

Can we get that number to zero unresolved by the of tomorrow so we can release 7.15 w/ a clean bill of health?

As a reminder, since 7.16 will be used for CRW 2.3, please refrain from committing any big breaking changes. 

Sprint 186 (Che 7.16) should be reserved for bugfixes, UI/UX polish, doc updates/rewrites, cleanup, etc. The docs team would LOVE your contributions! 

(Writing doc is really just about telling the story about how to use Che, so more people can experience the #CheJoy of your work.) :D 

Thanks,

Nick

On Wed, May 20, 2020 at 2:04 PM Nick Boldt <nboldt@xxxxxxxxxx> wrote:
Once again, we've done a release of 7.x. \o/ 

But we still have manual paperwork to do now at the end of the sprint.

https://github.com/eclipse/che/milestone/116 contains 10 open issues (with 38 closed).

Please move them to 7.14 if they're in progress, close them if they're done, or move them to your backlog if they're not scheduled for the next milestone.

Note also that the Che issue backlog is down to 883 issues (it was over 900 last time I sent this note), so let's keep chipping away at it!


As a reminder 7.14 should be a hardening sprint, focused on UX, bug fixes, documentation gaps.

Thanks!

---------- Forwarded message ---------
From: Nick Boldt <nboldt@xxxxxxxxxx>
Date: Mon, Apr 27, 2020 at 2:10 PM
Subject: Please resolve or move your 7.12 milestone issues // reminder about 7.13 and 7.14 sprints
To: che developer discussions <che-dev@xxxxxxxxxxx>


Once again, we've done a release of 7.x. \o/ 

This time, we did it more than 70% via a single release job, with only operator and chectl left to fully integrate. 

But we still have manual paperwork to do now at the end of the sprint.

https://github.com/eclipse/che/milestone/115 contains 11 open issues (with 43 closed).

Please move them to 7.13 if they're in progress, close them if they're done, or move them to your backlog if they're not scheduled for the next milestone.

Thanks!

---

As a reminder, 7.13 will be the last sprint into which new features / breaking changes are allowed as the sprint after that, 7.14, will be the one used to build CRW 2.2 and therefore should be stable. 

7.14 is also a great time to work on your bug backlog (there are over 900 open issues in Che issues - https://github.com/eclipse/che/issues !), to improve user experience, and to improve docs / write about new workflows and fixes you introduced in 7.13. That way the doc will be available to be downstreamed for CRW 2.2.

Once 7.14 is done, 7.15 will be open for new features & breaking changes. 

-- 

Nick Boldt

Principal Software Engineer, RHCSA

Productization Lead :: CodeReady Workspaces 

IM: @nickboldt / @nboldt / http://nick.divbyzero.com



“The Only Thing That Is Constant Is Change” - Heraclitus


--

Nick Boldt

Principal Software Engineer, RHCSA

Productization Lead :: CodeReady Workspaces 

IM: @nickboldt / @nboldt / http://nick.divbyzero.com



“The Only Thing That Is Constant Is Change” - Heraclitus

Back to the top