How to start AUT between the test cases automaticlly [message #912703] |
Fri, 14 September 2012 02:56 |
Lizzy Liu Messages: 10 Registered: August 2012 |
Junior Member |
|
|
I want to start the AUT between test cases, such as the following scenario:
1. Start AUT by Click "Start AUT" button on Jubula
2. Run the test suite which contain two test cases (The case steps are: do some operation in the AUT, then close the AUT; Start the AUT, do some operation, close the AUT)
But after runing the first case, it can't continue with the second case, for the AUT has closed and can't start automaticlly.
So my question is: Is there a way to make Jubula start AUT according to the steps automaticlly during the test execution but not start AUT by clicking the "Start AUT" button manually before executing the test suite?
(Now, I know there are two ways to start the AUT, but they are all manual ways, one is by manually click the Start AUT button, and another is by the autrun command.)
Thanks.
|
|
|
|
|
Powered by
FUDForum. Page generated in 0.28730 seconds