Skip to main content


Eclipse Community Forums
Forum Search:

Search      Help    Register    Login    Home
Home » Modeling » GMF (Graphical Modeling Framework) » how to create source and target node , when a connection drag
how to create source and target node , when a connection drag [message #150686] Thu, 13 September 2007 14:17
Eclipse UserFriend
Originally posted by: biju_gopinathan.rediffmail.com

Hi friends

we have parent node like A and B and it's Afixedchild of A and B
are a1 and b1. I need to drag connection between A and B
with a1 and b1 are source and target, a1 and b1 should be created
programatically on drag a connection.

any idea? thanks in advance


By biju
Previous Topic:Editor for profiled UML
Next Topic:How to hide some child figures from a parent figure at run time.
Goto Forum:
  


Current Time: Sat Jul 27 18:16:44 GMT 2024

Powered by FUDForum. Page generated in 0.03307 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top