Skip to main content


Eclipse Community Forums
Forum Search:

Search      Help    Register    Login    Home
Home » Modeling » BPEL Designer » Link support?
Link support? [message #1247] Wed, 02 November 2005 10:49 Go to next message
Eclipse UserFriend
Originally posted by: Tommi.Juhani.Heikkinen.cern.ch

Hello,

This is a question of details, but this seems to be the divider
characteristic in the existing BPEL designers. Some BPEL designers are
clearly link based, while the others don't visualise the links and encourage
to use Switch activity structure instead. The Links are part of the BPEL
specification and are very efficient in simplifying the BPEL process.

Best regards,
Tommi
Re: Link support? [message #1688 is a reply to message #1247] Sat, 05 November 2005 01:07 Go to previous message
Eclipse UserFriend
Originally posted by: edwin.khodabakchian.oracle.com

This is a very good question: The plan is to support both the auto-layout
power of structured BPEL with the flexibity of linked base flows.
Basically the designer will do autoflow until you insert a <flow>
activity. At that point, you can choose if the <flow> should be auto-layed
out of allow links/manual layout.

The IBM WBI 6.1 includes this! (very cool!).

-Edwin
Previous Topic:Link support?
Next Topic:what are the plans for a drop of the initial contribution?
Goto Forum:
  


Current Time: Thu Nov 14 10:53:17 GMT 2024

Powered by FUDForum. Page generated in 0.03740 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top