|
|
|
Re: Missing the obvious? How to generate Task Activity report [message #64344 is a reply to message #63616] |
Fri, 16 January 2009 22:00 |
Eclipse User |
|
|
|
Originally posted by: rob.elves.eclipse.org
outre wrote:
> Apologies for a stupid question but i can't seem to find where i can
> generate a Task activity report (task time for date range).
> I installed UI Reporting from the incubator but can't seem to find how
> to activate it.
> A pointer in the right direction would be greatly appreciated.
fyi, Tasktop builds on Mylyn and includes comprehensive time tracking
and reporting facilities. Tasktop, and many other Mylyn extensions are
outlined on the Extensions wiki page:
http://wiki.eclipse.org/Mylyn/Extensions
-Rob
--
Robert Elves
Mylyn Committer, http://eclipse.org/mylyn
|
|
|
|
|
|
Powered by
FUDForum. Page generated in 0.04752 seconds