Skip to main content


Eclipse Community Forums
Forum Search:

Search      Help    Register    Login    Home
Home » Eclipse Projects » Mylyn » How create tasks when offline from trac repository
How create tasks when offline from trac repository [message #56526] Mon, 25 August 2008 04:13 Go to next message
PK Mising name is currently offline PK Mising nameFriend
Messages: 44
Registered: July 2009
Member
Hello,
After a lot of effort I was able to get a trac repository and mylyn
working together. The Mylyn stuff that I have read say that offline task
creation is allowed. When I am disconnected from the trac repository I am
not able to create tasks that can be committed to trac. Can somebody tell
me if this is not supported at all? If this can be done, can somebody
please tell me how to do this.

Thanks,
PK
Re: How create tasks when offline from trac repository [message #56637 is a reply to message #56526] Tue, 26 August 2008 00:10 Go to previous message
Eclipse UserFriend
Originally posted by: steffen.pingel.eclipse.org

You have to install the XmlRpcPlugin for Trac and enable the XML-RPC access
type in the Mylyn repository properties. If you then create a task for Trac
using the latest Mylyn 3.0 version it will appear in the Unsubmitted
category in the task list. This does not require network connectivity and
you can reopen the task from there until submitted.

Steffen


> Hello,
> After a lot of effort I was able to get a trac repository and mylyn
> working together. The Mylyn stuff that I have read say that offline task
> creation is allowed. When I am disconnected from the trac repository I am
> not able to create tasks that can be committed to trac. Can somebody tell
> me if this is not supported at all? If this can be done, can somebody
> please tell me how to do this.
>
> Thanks,
> PK
Re: How create tasks when offline from trac repository [message #592768 is a reply to message #56526] Tue, 26 August 2008 00:10 Go to previous message
Steffen Pingel is currently offline Steffen PingelFriend
Messages: 706
Registered: July 2009
Senior Member
You have to install the XmlRpcPlugin for Trac and enable the XML-RPC access
type in the Mylyn repository properties. If you then create a task for Trac
using the latest Mylyn 3.0 version it will appear in the Unsubmitted
category in the task list. This does not require network connectivity and
you can reopen the task from there until submitted.

Steffen


> Hello,
> After a lot of effort I was able to get a trac repository and mylyn
> working together. The Mylyn stuff that I have read say that offline task
> creation is allowed. When I am disconnected from the trac repository I am
> not able to create tasks that can be committed to trac. Can somebody tell
> me if this is not supported at all? If this can be done, can somebody
> please tell me how to do this.
>
> Thanks,
> PK
Previous Topic:Generic Connector Login URL problems
Next Topic:Mylin JIRA Connector problems against latest Mylin features
Goto Forum:
  


Current Time: Sat Oct 19 11:19:04 GMT 2024

Powered by FUDForum. Page generated in 0.03252 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top