Skip to main content


Eclipse Community Forums
Forum Search:

Search      Help    Register    Login    Home
Home » Archived » EPF » Synchronization problems with Tasks, Role Descriptors and CVS
Synchronization problems with Tasks, Role Descriptors and CVS [message #53604] Mon, 15 September 2008 09:49 Go to next message
Kristian Mandrup is currently offline Kristian MandrupFriend
Messages: 44
Registered: July 2009
Member
Hi,

I have set up my project for use with CVS using the EPF CVS guidelines and
it kinda works (except I have to Share the project again each time I
restart EPF! When I do a synchronize, all my elements are given a pencil
icon (non-synchronized?) only those I edit in this session gets the
databse (synchronized) icon. Hmmm...

I defined a capability pattern. Created some activities. Added some tasks.
These tasks all have the same Roles assigned, however when I create the
corressponding Task Descriptors, linked to these Tasks only a few of the
TDs get corresponding Role Descriptors transferred. For the other tasks, I
can not by any means create Role Descriptors for some odd reason. All my
TDS are set to be "synchronized with source". Any idea what could be wrong?
If I delete a Task Descriptor and try to add it again (using drag and drop
from Navigator into Activity) I am unable to. It does NOT register at all.
Could be a CVS issue!? I am lost here...
If I drag'n drop any Task into my Capability pattern, Im told it is not
part of my default configuration of my proces. What does this mean?

Kristian
Re: Synchronization problems with Tasks, Role Descriptors and CVS [message #53629 is a reply to message #53604] Mon, 15 September 2008 10:17 Go to previous messageGo to next message
Kristian Mandrup is currently offline Kristian MandrupFriend
Messages: 44
Registered: July 2009
Member
It turned out, that my configuration .xmi file had ditched the first part
of its GUID for some odd reason! All my references to my configuration
were thus invalid and hence I coulds add Role Descriptors as no Roles were
part of my default UNRESOLVED plugin. Still, I don't understand why I must
manually add Role Descriptors for Each Task Descriptor. Why not by default
inherit those defined for the Task?
Re: Synchronization problems with Tasks, Role Descriptors and CVS [message #53656 is a reply to message #53604] Mon, 15 September 2008 20:03 Go to previous message
Shilpa Toraskar is currently offline Shilpa ToraskarFriend
Messages: 65
Registered: July 2009
Member
How do you create task descriptors first time thru DND or manually
creating in activity and then linking to task. If you DND task into
activity/cap pattern it should bring it's roles/wps creating corresponding
descriptors assuming it's in configuration. If those roles/wps are not in
configuration, it wont' bring it along. You can add those roles/wps for
the process' default configuration if you need it. Synchronization also
works on the default configuration. By default, all descriptors have
"Synchronized with source" selected, that's coming from meta-model because
we defined it that way.

You can check whether you can reproduce any of these without CVS to see
whether CVS is causing this or not.

--
Shilpa
Re: Synchronization problems with Tasks, Role Descriptors and CVS [message #590583 is a reply to message #53604] Mon, 15 September 2008 10:17 Go to previous message
Kristian Mandrup is currently offline Kristian MandrupFriend
Messages: 44
Registered: July 2009
Member
It turned out, that my configuration .xmi file had ditched the first part
of its GUID for some odd reason! All my references to my configuration
were thus invalid and hence I coulds add Role Descriptors as no Roles were
part of my default UNRESOLVED plugin. Still, I don't understand why I must
manually add Role Descriptors for Each Task Descriptor. Why not by default
inherit those defined for the Task?
Re: Synchronization problems with Tasks, Role Descriptors and CVS [message #590593 is a reply to message #53604] Mon, 15 September 2008 20:03 Go to previous message
Shilpa Toraskar is currently offline Shilpa ToraskarFriend
Messages: 65
Registered: July 2009
Member
How do you create task descriptors first time thru DND or manually
creating in activity and then linking to task. If you DND task into
activity/cap pattern it should bring it's roles/wps creating corresponding
descriptors assuming it's in configuration. If those roles/wps are not in
configuration, it wont' bring it along. You can add those roles/wps for
the process' default configuration if you need it. Synchronization also
works on the default configuration. By default, all descriptors have
"Synchronized with source" selected, that's coming from meta-model because
we defined it that way.

You can check whether you can reproduce any of these without CVS to see
whether CVS is causing this or not.

--
Shilpa
Previous Topic:Synchronization problems with Tasks, Role Descriptors and CVS
Next Topic:Unresolved configuration
Goto Forum:
  


Current Time: Sat Nov 09 03:30:54 GMT 2024

Powered by FUDForum. Page generated in 0.03192 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top